package edit
import (
"encoding/json"
"io"
"net/http"
"strings"
"testing"
cmdutil "gitcode.com/gitcode-cli/cli/pkg/cmdutil"
"gitcode.com/gitcode-cli/cli/pkg/iostreams"
"gitcode.com/gitcode-cli/cli/pkg/testutil"
)
func TestNewCmdEdit(t *testing.T) {
tests := []struct {
name string
args []string
wantErr bool
}{
{name: "no args", args: []string{}, wantErr: true},
{name: "one arg", args: []string{"42", "-R", "owner/repo", "--body", "B"}, wantErr: true},
{name: "invalid number", args: []string{"abc", "cid", "-R", "owner/repo", "--body", "B"}, wantErr: true},
{name: "valid with body", args: []string{"42", "cid", "-R", "owner/repo", "--body", "B"}, wantErr: false},
{name: "valid with body-file", args: []string{"42", "cid", "-R", "owner/repo", "--body-file", "c.md"}, wantErr: false},
{name: "valid with json", args: []string{"42", "cid", "-R", "owner/repo", "--body", "B", "--json"}, wantErr: false},
}
for _, tt := range tests {
t.Run(tt.name, func(t *testing.T) {
f := cmdutil.TestFactory()
cmd := NewCmdEdit(f, func(opts *EditOptions) error { return nil })
cmd.SetArgs(tt.args)
err := cmd.Execute()
if (err != nil) != tt.wantErr {
t.Errorf("Execute() error = %v, wantErr %v", err, tt.wantErr)
}
})
}
}
func TestEditRunUpdatesRepoComment(t *testing.T) {
t.Setenv("GC_TOKEN", "test-token")
var gotMethod, gotPath, gotBody string
ioStreams, _, out, _ := iostreams.Test()
opts := &EditOptions{
IO: ioStreams,
HttpClient: func() (*http.Client, error) {
return &http.Client{Transport: testutil.NewRoundTripFunc(func(req *http.Request) (*http.Response, error) {
gotMethod = req.Method
gotPath = req.URL.Path
b, _ := io.ReadAll(req.Body)
gotBody = string(b)
return &http.Response{
StatusCode: http.StatusOK,
Status: http.StatusText(http.StatusOK),
Header: make(http.Header),
Body: io.NopCloser(strings.NewReader(
`{"id":"c1","created_at":"2026-01-01","author":{"login":"user1"},"content":"Updated text","md_content":"Updated text","like_total":1,"reply_total":0}`)),
}, nil
})}, nil
},
BaseRepo: func() (string, error) { return "owner/repo", nil },
Number: 42,
CommentID: "c1",
Body: "Updated text",
JSON: true,
}
if err := editRun(opts); err != nil {
t.Fatalf("editRun() error = %v", err)
}
if gotMethod != http.MethodPut {
t.Fatalf("method = %s, want PUT", gotMethod)
}
if gotPath != "/api/v5/repos/owner/repo/discuss/42/comment/c1" {
t.Fatalf("path = %s, want /api/v5/repos/owner/repo/discuss/42/comment/c1", gotPath)
}
var req map[string]string
if err := json.Unmarshal([]byte(gotBody), &req); err != nil {
t.Fatalf("request body is not JSON: %v; body=%q", err, gotBody)
}
if req["md_content"] != "Updated text" {
t.Fatalf("request body = %q, want md_content", gotBody)
}
var result struct {
ID string `json:"id"`
MdContent string `json:"md_content"`
}
if err := json.Unmarshal(out.Bytes(), &result); err != nil {
t.Fatalf("output is not valid JSON: %v; output=%q", err, out.String())
}
if result.ID != "c1" || result.MdContent != "Updated text" {
t.Fatalf("result = %#v, want updated comment", result)
}
}
func TestEditRunValidatesRequiredFields(t *testing.T) {
tests := []struct {
name string
opts *EditOptions
}{
{name: "missing comment-id", opts: &EditOptions{Number: 42, Body: "B"}},
{name: "missing body", opts: &EditOptions{Number: 42, CommentID: "c1"}},
}
for _, tt := range tests {
t.Run(tt.name, func(t *testing.T) {
io, _, _, _ := iostreams.Test()
tt.opts.IO = io
tt.opts.HttpClient = func() (*http.Client, error) { return &http.Client{}, nil }
tt.opts.BaseRepo = func() (string, error) { return "owner/repo", nil }
err := editRun(tt.opts)
if err == nil {
t.Errorf("editRun() expected usage error for %s", tt.name)
}
})
}
}
func TestEditRunAPIError(t *testing.T) {
t.Setenv("GC_TOKEN", "test-token")
ioStreams, _, out, _ := iostreams.Test()
opts := &EditOptions{
IO: ioStreams,
HttpClient: func() (*http.Client, error) {
return &http.Client{Transport: testutil.NewRoundTripFunc(func(req *http.Request) (*http.Response, error) {
return &http.Response{
StatusCode: http.StatusNotFound,
Status: http.StatusText(http.StatusNotFound),
Header: make(http.Header),
Body: io.NopCloser(strings.NewReader(`{"message":"not found"}`)),
}, nil
})}, nil
},
BaseRepo: func() (string, error) { return "owner/repo", nil },
Number: 42,
CommentID: "c1",
Body: "B",
}
if err := editRun(opts); err == nil {
t.Fatal("editRun() expected error on API failure")
}
if out.Len() != 0 {
t.Fatalf("stdout = %q, want no partial output", out.String())
}
}