Merged
fix docs #11132
CrrryyyyAdd on Sep 2
fix docs #11132
Merged
Pull Request has been successfully merged by CANN-robot.
(Thank you for Crrryyyy's contribution.)atomgit-bot
Sep 2 Comments:
Sep 2 Comments:


Incorrect?
Sep 2 Added label: cann-cla/yes
CANN-robot
Sep 2 Comments:
Sep 2 Comments:
Thanks for your pull-request.
The full list of commands accepted by me can be found at here.
You can get sig-info at here.
You can self-configure the PR merge rules for this repository. For more details, please refer to Here.
For more, you also can visit HICANN.
PR Approval Progress
✅ Congratulations! All modules have met the lgtm and approve requirements.
Module Approval Details
| module | lgtm status | approve status |
|---|---|---|
| */*/docs/acl*.md | ✅ 蔡雯雯, 杨露 (2/2) | ✅ 蔡雯雯, 杨露 (2/1) |
💡 Tip:
- Committer can comment
/approveor/lgtm- Commenting
/approveimplies both code review (lgtm) and intent to merge (approve)
CLA Signature Pass
Crrryyyy, thanks for your pull request. All authors of the commits have signed the CLA. 👍


Sep 2 Set chenkang30,juyangokok,monologue815,chaotang233,wuyi_huawei,chen-linxin4,jiang-lirui,Allan_Yu,gitee-duhuiping,claire8090,liudan12,shi-rui,gitcode-chenjiao,cc-z,kknan,Ww7012,wenxin_fight,mabing1118,fengying555682,caiwenwen,yanglu-1 as approver
Sep 2 Set chenkang30,juyangokok,monologue815,chaotang233,wuyi_huawei,chen-linxin4,jiang-lirui,Allan_Yu,gitee-duhuiping,claire8090,liudan12,shi-rui,gitcode-chenjiao,cc-z,kknan,Ww7012,wenxin_fight,mabing1118,fengying555682,caiwenwen,yanglu-1 as approver
Sep 2 Set gitee-duhuiping,claire8090,gitcode-chenjiao,Ww7012,fengying555682,caiwenwen,yanglu-1 as approver
Sep 2 Set gitee-duhuiping,claire8090,gitcode-chenjiao,Ww7012,fengying555682,caiwenwen,yanglu-1 as approver
Sep 2 Modify description of pull request
Crrryyyy
Sep 8 Comments:
Sep 8 Comments:
compile


Sep 8 Pre merge succeeded (commit_id: 85eabc5a426ca41ee0a4d917efc07e9b36869f68)
CANN-robot
Sep 8 Comments:
Sep 8 Comments:
| 🚀 CI 流水线已启动 |
|---|
| 📋 执行详情: 点击查看流水线 |


Sep 8 Added label: ci-pipeline-running
Sep 8 Removed label: ci-pipeline-running
Sep 8 Added label: ci-pipeline-passed
Crrryyyy
Sep 8 Comments:
Sep 8 Comments:
/check-pr


CANN-robot
Sep 8 Comments:
Sep 8 Comments:
The following labels are not ready.
lgtm: Please wait for committers to review the code.
approved: Please wait for committers to review the code.


yanglu-1
Sep 8 Comments:
Sep 8 Comments:
/lgtm
/approve


Sep 8 Added label: approved
caiwenwen
Sep 8 Comments:
Sep 8 Comments:
/lgtm
/approve


Sep 8 Added label: lgtm
Sep 8 Closed associated issue
Sep 8 Merged pull request
描述
修正
aclnnGroupedMatmulFinalizeRoutingV3参数说明表中的非连续 Tensor 支持标记,使文档与接口实际能力保持一致。将x1、x2、scaleOptional、biasOptional、pertokenScaleOptional、groupListOptional、sharedInputOptional、logitOptional和rowIndexOptional的“非连续Tensor”标记由-更新为√。关联的Issue
关联 Issue:https://gitcode.com/cann/ops-transformer/issues/4900
测试
本次仅修改文档,已检查参数表内容及 Markdown diff,不涉及代码逻辑和运行时测试。
文档更新
更新
gmm/grouped_matmul_finalize_routing/docs/aclnnGroupedMatmulFinalizeRoutingV3.md。类型标签