Merged
docs: 按产品名称映射表统一产品名称(其余API及其他内容) #6574
docs: 按产品名称映射表统一产品名称(其余API及其他内容) #6574
Merged
munanhwAdd on Oct 8
munanhwCollaborators
Oct 8

描述

从 #6524 拆分:docs/zh/api 其余部分(SIMD-API 除 c_api 外、AI-CPU-API、SIMT-API、Utils-API、appendix)、tests、contributing、.agent、README、CHANGELOG、docs/en 指南等(148 个文件);含 ListTensorDesc 表格由 HTML 整改为 Markdown 简易表格

整改规则(依据产品名称映射表):

  • Ascend 950PR/Ascend 950DT 系列(含衍生/简写/带空格斜杠变体)统一为 Ascend 950PR&950DT系列产品(英文:Ascend 950PR&950DT products)
  • Atlas A2/A3 训练系列产品与推理系列产品合并为 Atlas A2系列产品 / Atlas A3系列产品(英文:Atlas A2/A3 products)
  • Atlas 200I/500 A2 推理产品、Atlas 推理/训练系列产品(含 AI Core / Vector Core 场景)去空格
  • 同名并列对按合并语义收敛为单一规范名(如 Atlas A3 products/Atlas A3 products -> Atlas A3 products)

关联的Issue

无

测试

  • 全量改动已在 #6524 上通过完整 CI(compile 流水线 ci-pipeline-passed),本 PR 为其按目录拆分的等价子集
  • 旧名称形式残留为 0、叠字残留为 0;图片路径与文件链接未做任何改动

文档更新

本 PR 为文档产品名称整改

类型标签

likedislike
Pull Request has been successfully merged by CANN-robot.
(Thank you for munanhw's contribution.)
MmunanhwCollaborators
Oct 8 Created pull request, commit b0be5fbc
atomgit-bot
atomgit-bot
Oct 8 Comments:

变更摘要

本 PR 是一次文档产品名称的规范化整改,依据产品名称映射表统一 docs/zh/api 其余部分(SIMD-API 除 c_api 外、AI-CPU-API、SIMT-API、Utils-API、appendix)、tests、contributing、.agent、README、CHANGELOG、docs/en 指南等范围内的产品名称表述,并顺带将 ListTensorDesc 表格由 HTML 形态整改为 Markdown 简易表格。整改不涉及代码逻辑、接口签名或图片路径/文件链接的改动,属于纯文档层面的名称与格式收敛。

主要改动

  • Ascend 950PR/950DT 系列名称统一: 将 Ascend 950PR/Ascend 950DT 系列及其衍生、简写、带空格或斜杠的变体统一为「Ascend 950PR&950DT系列产品」(英文为 Ascend 950PR&950DT products)。
  • Atlas A2/A3 训练与推理系列合并命名: 将 Atlas A2/A3 训练系列产品与推理系列产品分别合并收敛为「Atlas A2系列产品」「Atlas A3系列产品」(英文为 Atlas A2/A3 products)。
  • 推理/训练产品名称去空格: 对 Atlas 200I/500 A2 推理产品、Atlas 推理/训练系列产品(含 AI Core / Vector Core 场景)的名称去除空格,统一书写形式。
  • 同名并列项按合并语义收敛: 将同名并列对(如 Atlas A3 products/Atlas A3 products)按合并语义收敛为单一规范名(如 Atlas A3 products)。
  • ListTensorDesc 表格格式整改: 将 ListTensorDesc 表格由 HTML 形式改写为 Markdown 简易表格。
likedislike
Incorrect?
atomgit-bot
atomgit-bot
Oct 8 Comments:

🤖 本次改动均为数据 / 生成 / 二进制文件(如测试用例、锁文件、媒体资源),没有可审查的代码逻辑,已跳过 AI 代码审查。

likedislike
Incorrect?
CANN-robotCANN-robotCollaborators
Oct 8 Added label: cann-cla/yes
CANN-robot
CANN-robotCollaborators
Oct 8 Comments:

Thanks for your pull-request.
The full list of commands accepted by me can be found at here.
You can get sig-info at here.
You can self-configure the PR merge rules for this repository. For more details, please refer to Here.
For more, you also can visit HICANN.


PR Approval Progress

✅ Congratulations! All modules have met the lgtm and approve requirements.

Module Approval Details

module lgtm status approve status
docs ✅ ai_xin, wuyang_hw, XuebinYang (3/2) ✅ ai_xin (1/1)
repo-cann/asc-devkit ✅ wuyang_hw, XuebinYang (2/2) ✅ wuyang_hw (1/1)

💡 Tip:

  • Committer can comment /approve or /lgtm
  • Commenting /approve implies both code review (lgtm) and intent to merge (approve)

CLA Signature Pass

munanhw, thanks for your pull request. All authors of the commits have signed the CLA. 👍

likedislike
CANN-robotCANN-robotCollaborators
Oct 8 Set zengjuan,zhanghao_0689,suqwe,wulinyu,kong0808,dengjing_aoe,YeZZzzz1,bluesky901,yangbinhua,zhudi22,chenyiyuan,xun_zhuge,XuebinYang,sjtulxh,bianque,houyuyang,Lycheeeee,YANXI_ZHAO,chentianyu19,shi_nanxiang,wuyang_hw,jiangxinyu3,ai_xin,ascendhjh,hujiawen_kaven,wangxiaozhi,DragonBornHD84,louyuxuan,hyolee,yukangchen as approver
16 event messages are collapsed here。 See more
CANN-robotCANN-robotCollaborators
Oct 8 Added label: cann-cla/yes
munanhwCollaborators
Oct 8 Comments:

/compile

likedislike
MmunanhwCollaborators
Oct 8 Pre merge succeeded (commit_id: 719de346f502441849744f1b6dfc10e9c1a6b1b6)
CANN-robot
CANN-robotCollaborators
Oct 8 Comments:
🚀 CI 流水线已启动
📋 执行详情: 点击查看流水线
likedislike
CANN-robotCANN-robotCollaborators
Oct 8 Added label: ci-pipeline-running
CANN-robotCANN-robotCollaborators
Oct 8 Removed label: ci-pipeline-running
CANN-robotCANN-robotCollaborators
Oct 8 Added label: ci-pipeline-passed
bianqueCollaborators
Oct 8 Comments:

/lgtm

likedislike
MmunanhwCollaborators
Oct 8 Pre merge succeeded (commit_id: 2ac9e78e4cc065b658ad18e85274ace7aafe3e48)
MmunanhwCollaborators
Oct 8 Pushed 4 commits:77d38713-3 commits from branch master,a19d02bd-Merge upstream/master: 同步上游3个提交,接受上游对addc/subc的删除
MmunanhwCollaborators
Oct 8 Pre merge succeeded (commit_id: 1d8433c0b66f5eb95db4a6e1803b505833a6ae7f)
CANN-robotCANN-robotCollaborators
Oct 8 Removed label: cann-cla/yes
CANN-robotCANN-robotCollaborators
Oct 8 Removed label: ci-pipeline-passed
CANN-robot
CANN-robotCollaborators
Oct 8 Comments:

Notification

This pull request has been changed(code update) or closed, so removes the following label(s): ci-pipeline-passed.

likedislike
CANN-robotCANN-robotCollaborators
Oct 8 Added label: cann-cla/yes
ai_xinCollaborators
Oct 8 Comments:

/approve

likedislike
munanhwCollaborators
Oct 8 Comments:

/compile

likedislike
MmunanhwCollaborators
Oct 8 Pre merge succeeded (commit_id: 4c5ee719f0bf7f15bbecab3f91b5113d0e3ba486)
CANN-robot
CANN-robotCollaborators
Oct 8 Comments:
🚀 CI 流水线已启动
📋 执行详情: 点击查看流水线
likedislike
CANN-robotCANN-robotCollaborators
Oct 8 Added label: ci-pipeline-running
CANN-robotCANN-robotCollaborators
Oct 8 Removed label: ci-pipeline-running
CANN-robotCANN-robotCollaborators
Oct 8 Added label: ci-pipeline-passed
ai_xinCollaborators
29 days ago Comments:

/approve

likedislike
吴洋Collaborators
29 days ago Comments:

/lgtm
/approve

likedislike
CANN-robotCANN-robotCollaborators
29 days ago Added label: approved
XuebinYangCollaborators
29 days ago Comments:

/lgtm

likedislike
CANN-robotCANN-robotCollaborators
29 days ago Added label: lgtm
CANN-robotCANN-robotCollaborators
29 days ago Merged pull request