Merged
[9.2.0] refactor/perf: 回合算子迁移清理与 Sort 性能优化 #5809
黄晓彬Add on Sep 18
[9.2.0] refactor/perf: 回合算子迁移清理与 Sort 性能优化 #5809
Merged
Pull Request has been successfully merged by CANN-robot.
(Thank you for 黄晓彬's contribution.)Sep 18 Added label: stat/needs-squash
Sep 18 Added label: cann-cla/yes
CANN-robot
Sep 18 Comments:
Sep 18 Comments:
Thanks for your pull-request.
The full list of commands accepted by me can be found at here.
You can get sig-info at here.
You can self-configure the PR merge rules for this repository. For more details, please refer to Here.
For more, you also can visit HICANN.
PR Approval Progress
✅ Congratulations! All modules have met the lgtm and approve requirements.
Module Approval Details
| module | lgtm status | approve status |
|---|---|---|
| */*/op_api/*.h | ✅ yue-ma, 王永光, 王瑞 (3/2) | ✅ 王永光 (1/1) |
| */*/op_host/*_def.cpp | ✅ 王瑞, yue-ma, 王永光 (3/2) | ✅ 王永光 (1/1) |
| math/sort | ✅ yue-ma, 王瑞 (2/2) | ✅ 王瑞, yue-ma (2/1) |
| repo-cann/ops-math | ✅ yue-ma, 王瑞 (2/2) | ✅ yue-ma, 王瑞 (2/1) |
💡 Tip:
- Committer can comment
/approveor/lgtm- Commenting
/approveimplies both code review (lgtm) and intent to merge (approve)
CLA Signature Pass
ConanHuang, thanks for your pull request. All authors of the commits have signed the CLA. 👍


Sep 18 Set FelixTang7,yue-ma,zhou-qilong,wangrui_,rxtfeng,loov1,tang-lei01,zhangzijie,jia0liang,zl_hw,songkai111,chenxingyu18,pingchuantang,llimwang,gubaocheng,andong_hw,wangyongguang,xuejinghui,zhanw_coding as approver
Sep 18 Set FelixTang7,yue-ma,zhou-qilong,wangrui_,rxtfeng,loov1,tang-lei01,zhangzijie,jia0liang,zl_hw,songkai111,chenxingyu18,pingchuantang,llimwang,gubaocheng,andong_hw,wangyongguang,xuejinghui,zhanw_coding as approver
Sep 18 Set FelixTang7,yue-ma,zhou-qilong,wangrui_,rxtfeng,loov1,tang-lei01,zhangzijie,jia0liang,zl_hw,songkai111,chenxingyu18,pingchuantang,llimwang,gubaocheng,andong_hw,wangyongguang,xuejinghui,zhanw_coding as approver
Sep 18 Set FelixTang7,yue-ma,zhou-qilong,wangrui_,rxtfeng,loov1,tang-lei01,zhangzijie,jia0liang,zl_hw,songkai111,chenxingyu18,pingchuantang,llimwang,gubaocheng,andong_hw,wangyongguang,xuejinghui,zhanw_coding as approver
CANN-robot
Sep 18 Comments:
Sep 18 Comments:
| 🚀 CI 流水线已启动 |
|---|
| 📋 执行详情: 点击查看流水线 |


Sep 18 Added label: ci-pipeline-running
8 event messages are collapsed here。 See more
wangyongguang
Sep 18 Comments:
Sep 18 Comments:
/approve


Sep 18 Added label: approved
Sep 18 Added label: lgtm
Sep 18 Closed associated issue
Sep 18 Merged pull request
描述
基于 9.2.0,按顺序 cherry-pick 以下 PR:
配套 9.2.0 PR:https://gitcode.com/cann/ops-nn/pull/10728 。两个仓库的迁移改动需配套合入。
关联的Issue
https://gitcode.com/cann/ops-math/issues/3141
https://gitcode.com/cann/ops-math/issues/3230
测试
文档更新
不涉及
类型标签